This is the completed map showing the planned removal. But, it turned out that we were able to remove the mosaic in much larger pieces thereby resulting in 75% fewer cuts. With this map, every piece is documented and can be put back together like a puzzle. This is, actually, the way the mosaic mural was made (then shipped) to the installation site originally… in 1 ft sq. pieces and then put together like a puzzle.










